Description of Work:

A contractor will remove older/unused equipment, install new pumps, new chillers, and new cooling towers

Impact for Campus:

  • There will be construction traffic (i.e., cranes and contractor trucks), dust, and noise.

  • Between March 9-13 there will be a large crane on campus removing cooling towers and chillers.

  • There will be buildings that will be warmer and colder throughout the construction timeframe.  Shutdowns of existing chiller and boilers are required as work is completed.

Action(s) Required:

  • Please follow posted signage, caution tape and cones

  • Please do not park near the Central Plant, or in Ridgway Drive

  • Use caution near equipment and construction activity.

  • If your building becomes too hot (i.e., 80+ degrees) or to cold (62 or lower), please notify campus Facilities Maintenance.

Thank you for your patience as we build and maintain our beautiful campus.